Head Office Number:

Boiler & Central Heating Terms and Conditions

In these conditions, EcoWatt Renewable Solutions LTD t/a Prime Time Boilers is referred to as “the Company”, and the person agreeing to the Contract is referred to as “the Customer”. By signing the order form, you are agreeing to this Contract.

  • All the terms of the Contract between the Customer and the Company are contained in this document and the written specifications (if any) provided to the Customer. No variation of the terms shall bind either party unless such variation is made in writing and signed by the party to be bound.
  • The Company, having discussed with the Customer the requirements for the installation of the heating products as listed on the order form, may need to carry out a survey to take detailed measurements and/or specifications. Any Contract is subject to the surveyor’s report and findings. The Company reserves the right to decline the work detailed in the Contract should its surveyor consider it appropriate to do so. Should this become necessary, the liability of the Company in these circumstances is limited to the refund of any deposit paid by the Customer, and these sums will be returned immediately.
  • Any changes in materials and/or specifications from those detailed in the schedule on the order form will only apply when supported by a new order form which must be signed by both parties, i.e. “the Company” and “the Customer”.
  • Delivery and installation timescales are approximate and shall be deemed to commence from the date on which all details of the order have been agreed and payment of any applicable deposit has been received. Timescales are subject to any circumstances beyond the control of the Company which may interfere with the execution or completion of the works. In such circumstances, the Contract shall not be deemed void.
  • We will carry out the work during normal working hours, Monday to Friday, but may on occasion need to use a reasonable amount of overtime to achieve completion. It is a condition of this Contract that your approval to such overtime is granted, although we will endeavour to minimise any disruption or inconvenience. Should the works take longer than originally expected, we are not liable for loss of earnings, including wages and rental income. This also applies to missed or rescheduled appointments due to unforeseen circumstances. Should any overtime or unsocial working hours be specifically requested by you, other than any special arrangement charged for and agreed on the sales order form, it may be necessary for us to add extra costs. These will be explained and agreed prior to the additional working hours taking place. We will require access to the relevant property at all reasonable times whilst the work is being carried out and would expect free use of water, electricity and gas to enable us to complete the work in accordance with this Contract.
  • Due to the Company’s policy of continuous improvement, the Customer shall have the benefit of any modifications the Company may make to its products and procedures, although these changes may be made without prior notice to the Customer. All illustrations within the Company’s literature and that of its suppliers are intended as a guide only.
  • Any concession, latitude or waiver allowed by the Company at any time shall be without prejudice to its full rights under this Contract and shall not prevent the Company from subsequently exercising such rights.
  • The Customer must pay the outstanding Contract balance in full on completion of the installation, in cleared funds, subject to any right to withhold payment under this agreement or by law. When payments have been made to the Company, the Customer must retain a copy of the invoice showing payment received. This will be supplied to the Customer by either post or email once funds have cleared. Accepted payment methods are cash, bank transfer or debit card over the phone. If remedial work is necessary, the Customer may withhold a maximum of 10% of the value of the invoice until such work is carried out.
    If the Customer fails to pay any amount due on completion, the Company may charge interest on the overdue amount at an annual rate of 2 percentage points above the Bank of England base rate from time to time, calculated daily from the day after payment becomes due until payment is received in full in cleared funds.
    The Customer shall reimburse the Company, on an indemnity basis, for all costs and expenses reasonably incurred in recovering overdue sums or enforcing this agreement, including reasonable legal fees, debt recovery costs and court fees, subject to applicable law and any order of the court.
    Nothing in this clause affects the Customer’s statutory rights.
    All goods supplied remain the property of the Company, even though installed, by way of a lien until fully paid for. The guarantee may be void if payment is not made and the above conditions are not adhered to. If you have entered into a Credit Agreement, the Company is paid directly by its nominated finance provider.
    Once your installation has been completed, we will issue you with an invoice showing that the balance has been paid.
  • If the Customer has entered into a Credit Agreement via the Company’s nominated finance providers, the terms of their agreement will apply as part of this Contract. If the Credit Agreement is later cancelled, then subject to the terms of the Consumer Credit Act 1974, the Contract balance will become immediately payable. This does not affect your statutory rights.
  • In the event of suspension or cancellation of the work at the request of the Customer, or lack of instructions or delays on site caused by the Customer, whether relating to materials or time, any extra expenses incurred or losses suffered by the Company shall be chargeable to the Customer. It is the Customer’s responsibility to ensure that any access, licence, permit or other authority necessary for the execution of the work is obtained and that existing property boundaries are correctly defined.
  • Whilst every care will be taken by the Company, it accepts no liability for any damage to plasterwork, decorations, flooring or other fixtures and fittings which may arise as a consequence of the work carried out, unless specifically provided for in the schedule on the sales order form or where such damage results from negligence on the part of the Company. Where possible, cuts or holes made to allow for the installation of equipment will be made good but will not be permanently finished or redecorated. Floorboards will be reinstated or replaced where necessary, but special or laminated flooring will need to be removed by the Customer and cannot be guaranteed to be permanently refitted. Any carpets which have to be lifted will be re-laid to the best of our engineers’ ability; however, we cannot be held responsible for the condition or successful reinstatement of carpets which have been nailed or glued down.Where an existing boiler or associated pipework is enclosed within a cupboard, fitted unit, boxing-in or other structure, it is the Customer’s responsibility to ensure that these are removed where necessary to provide suitable access prior to installation. The Customer is also responsible for their reinstatement following completion of the works. Where such items have not been removed, our engineers will endeavour to assist with their removal and refitting where reasonably practical and safe to do so. However, due to the age, condition, construction or method of fixing of existing cupboards and boxing-in, removal may result in unavoidable damage, and we cannot guarantee that these items can be reinstated to their original condition or position. Changes to the size or positioning of the new boiler and associated pipework may also prevent existing cupboards or boxing-in from being refitted. The Company accepts no responsibility for unavoidable damage arising from the reasonable removal of such items, or for any additional carpentry, alterations, repairs or replacement required, unless specifically included within the sales order form. This does not exclude liability for damage caused by a failure to exercise reasonable care and skill.If access is required, it is the Customer’s responsibility to ensure that the area is clear of furniture, personal belongings and other obstructions. It should be anticipated that a certain amount of redecoration may be required following installation, and this will be the Customer’s responsibility and is not included in the quoted price. This will be discussed with the Customer during our survey wherever reasonably foreseeable. Similarly, the Company accepts no responsibility for damage attributable to existing structural defects or weaknesses unless such damage results from negligence on the part of the Company, its employees or subcontractors.

INSTALLATION WARRANTY:

  • All new central heating systems and upgrades carry a 2-year workmanship warranty from the date of installation, subject to the boiler being serviced annually. No guarantee can be given, however, regarding the integrity or suitability of any existing components being connected to, and the Company cannot be held responsible for the failure of any such components or defects existing within any part of the original system, i.e. radiators, pipework, showers, taps, etc. Where products are connected to existing hot and cold water pipes, tanks or cisterns, the installation is based on the assumption that the existing plumbing system is in satisfactory condition. When converting a system, existing pipes may be subjected to higher pressure than previously experienced, and the Company cannot be held responsible for leaks arising from pre-existing defects or weaknesses in existing pipework, except where caused by a failure to exercise reasonable care and skill. Unless otherwise stated in the Contract, the guarantee does not cover drains, defects due to fair wear and tear, the replacement of lamps, bulbs and fuses, or any causes beyond the Company’s control. If any repairs, alterations or additions to the equipment, installation and/or apparatus are carried out by a person who has not been authorised by EcoWatt Renewable Solutions LTD t/a Prime Time Boilers, the guarantee may be rendered void where such work affects the installation or causes the relevant defect.
  • As it is necessary that all pipes are accessible, we will not normally bury them in solid floors or walls, and pipes will remain exposed in these situations. Boxing-in of pipework is not included unless specifically detailed on the order form.
  • On all installations, the Company performs a chemical flush of the system. If it is determined that the system contains a build-up of sludge which cannot be removed through this procedure, a power flush may be required. This would be chargeable, and the Company will provide a quotation for the additional work.
  • Where combination boilers are supplied, hot water flow rates may be reduced if more than one tap or outlet is used simultaneously. This is not a fault and is a characteristic of most combination boilers.
  • It is the responsibility of the Customer to ensure that a suitable gas supply and meter are available at the relevant property. Where this is not the case, the Customer will need to arrange a supply via a suitable pipeline provider. A gas meter will also be required and must be arranged separately with a gas supplier. Any costs incurred are to be paid by the Customer and are not included as part of this Contract unless specifically stated on the order form.
  • Where required, the Company will install a new electrical cable for the boiler. If there is no suitable route for the cable to be run, a wireless switch box may be required. This would be chargeable.
  • Our engineers will access roofs and work at height where possible and safe to do so. If additional access arrangements are required, such as a roofer, scaffolding or other specialist equipment due to health and safety requirements, these will be charged as an additional cost to the Customer. If the Customer arranges or supplies any access equipment themselves, it is their responsibility to ensure that it is adequate and safe for our engineers to use.
  • The price we quote does not include the cost of removing any dangerous waste materials, such as asbestos, that could not reasonably have been identified when the quotation was provided. The Customer may arrange for a specialist contractor to remove these materials, or the Company may be able to arrange their removal at an additional cost. Where asbestos is removed, the Customer will be required to provide the appropriate site clearance documentation, including a certificate of reoccupation where applicable, from the asbestos removal contractor before work can continue at the property.
  • The price we quote includes the removal of all non-dangerous waste materials arising from our installation work, including the old boiler and central heating components which we replace.
  • The Contract price quoted is subject to any changes in Value Added Tax.

BOILER WARRANTY:

All boilers supplied by the Company carry a manufacturer’s parts and labour warranty, the length of which will be discussed at the time of order. All warranties are subject to an annual service history. An annual service must be carried out by a Gas Safe Registered engineer, and documentation must be made available upon request. Proof of annual servicing will be required to validate the boiler’s warranty throughout the warranty period, subject to the manufacturer’s terms and conditions. We will always endeavour to contact you to arrange this, but it remains the Customer’s responsibility to ensure that the annual service is carried out.

RADIATORS AND TOWEL RAILS:

New radiators or towel radiators supplied and installed as part of a new central heating system or system upgrade are covered by the Company’s 2-year workmanship warranty from the date of installation.

Where the Customer’s existing radiators are being utilised and connected to, they will not be covered under the standard warranty, and the terms and conditions relating to existing components and pipework will apply.

Existing radiators not installed by the Company will be covered for 6 months from the installation date for issues relating to airlocks or radiators not heating up.

Separate rules will apply if one of the Company’s extended warranty schemes is selected on the date the Contract is signed. Copies are available upon request.

If purchased separately, Thermostatic Radiator Valves will be fitted where applicable in accordance with current Building Regulations and/or CHeSS recommendations for Best Practice in Housing Energy Efficiency (Central Heating System Specifications).

OTHER ITEMS:

All other items supplied by Prime Time Boilers carry the relevant manufacturer’s standard warranty, along with our 1-year workmanship warranty.

As part of our responsibilities, we will use a Gas Safe Registered engineer to install your new boiler. We are required to connect any new gas appliance to a gas supply that is safe and sound. Consequently, we will need to carry out a gas soundness test on the first day of installation of any new boiler or heating system.

Should there be any leak or defect within the existing gas pipework, we may have no alternative but to isolate the supply, take the necessary steps to make the installation safe, or replace the affected gas pipework before the installation work can continue.

Although this is a relatively rare occurrence, any such work is unforeseen and may be charged as an additional amount to that shown on the order form.

Where brickwork, stonework or other masonry has to be made good, for example at the original flue position of your old boiler, and we are unable to provide an exact match for the existing materials due to restrictions on availability or the effects of weathering over the years, we will endeavour to provide a similar finish wherever possible.

Should the Customer wish to provide their own materials for matching purposes, we will make an appropriate allowance in the calculation of the agreed price.

NOTICE OF YOUR RIGHT TO CANCEL:

You, as “the Customer”, have the right to cancel this Contract if you wish. This can be done at any time during the period of 14 calendar days starting from the date of receipt of this notice, subject to the applicable statutory cancellation rules.

The notice of cancellation is deemed to be served as soon as it is posted or sent in the case of electronic communication.

If work under the above Contract has begun with your express agreement before the end of the cancellation period, you may be required to pay for any goods or services supplied, subject to your statutory rights and the applicable cancellation regulations.

Any related credit agreement will automatically be cancelled if the Contract for goods and services is cancelled.

If you wish to cancel the Contract, you must notify Prime Time Boilers. You can do so in writing and deliver your notice personally, send it by post to Prime Time Boilers, Choles Yard, High Road, North Weald, Essex, CM16 6EG, or email info@primetimeboilers.co.uk.

PLEASE READ CAREFULLY BEFORE SIGNING

The Purchaser agrees to buy, and the Company agrees to install, the goods detailed within the sales order form.

The Purchaser acknowledges that the Terms and Conditions have been read and understood and confirms receipt of a copy of this Contract, including notice of their cancellation rights.

By signing our order form, you are agreeing to our Terms and Conditions and Contract.

EcoWatt Renewable Solutions LTD is authorised and regulated by the Financial Conduct Authority, FRN 646914. We act as a credit broker, not a lender, and offer finance from a panel of lenders. Finance provided by a lender is subject to their terms and affordability checks. We do not receive any commission from a lender for arranging finance.

Our Partners

A-Rated Boiler Installation Made Easy

Contact form Phone View - Prime Time Boiler

Answer 8 Simple Questions

And receive an instant online quote, now that's what we call super easy.

Boilers Brands - Prime Time Boiler Partners

Book a Free Boiler Survey and Find the Best A-Rated Boiler

You pick a survey date and time, we give you a variety of A-Rated boilers to choose from.

Date Time Icon

Choose an Install Date and Time

With A local Gas Safe approved engineer that’s just a stone’s throw away from you.

Get An Instant Quote

Real People, Real Experiences, Real Reviews

5 boilers
Hero image
UP TO 12 YEAR WARRANTY
GAS, OIL, ELECTRIC BOILERS
Next Day Installation

New Boiler with Installation from only £9.99 a month

Get Your Instant Quote

Simply complete the form to receive your free quotation.

Gas Boiler Quote - Middle

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
9.9% APR Representative Example: Cash Price £1,750. Deposit Payable £977. Total Amount of Credit £773. Total Interest £426. Total Amount Repayable £2,176. Repayable by 120 monthly instalments of £9.99. Representative 9.9% APR (fixed). Rate of Interest 9.9% a year (fixed). Duration of Agreement 120 months.
Get An Instant Quote
5 Boilers Honeywell Thermostat

What's Included With Your A-Rated Boiler

Up-To 12 Year Manufacturer Warranty

24 Month Workmanship Warranty

Magnetic Filter

Limescale Filter

Chemical Flush

Free Honeywell Thermostat (Worth £300)

Get An Instant Quote

Keeping It Local Since 2010

Since 2010, Prime Time Boilers have been working with and supporting local Gas Safe approved engineers across England. No matter where you are based, we are just a stone through away.

Get An Instant Quote
Map Icon

Get Your Instant Quotation Now

Click Here For Your Instant Quote